Software Failure Analysis
By Mission Ready Software
November 2026
Microsoft 365, the FAA, JPMorgan Chase, United Airlines, the NSA and Apple all went down in one week — and none of it was a cyberattack. What six software failures in six days tell us about the growing pool of latent defects…
Read More ›
Software FMEA Guide
By Mission Ready Software
September 2026
A practical guide to modern software FMEA using the 6-Dimensional Common Defect Enumeration approach to identify edge cases and failure modes before they become expensive failures.
Read More ›
Software Reliability Benchmarking
By Mission Ready Software
A 679-factor benchmarking study identifies five widely used practices that show little or no measurable effect on software defect density.
Read More ›
Newsletter
By Mission Ready Software
149 projects. 679 factors. A 250:1 gap in escaped defect density between the best and worst performers — and it isn’t CMMi. What actually separates the top 3% is requirements for what the software must NOT do, domain experts over language experts…
Read More ›
Newsletter
By MissionReady
Why DO-178C compliance is necessary but not sufficient. Requirements-based testing and MC/DC coverage never ask whether the requirements document itself was complete — and the 737 MAX shows what that gap costs…
Read More ›
Uncategorized
By MissionReady
July 21, 2026
“Check-the-box” safety compliance is a silent tax on engineering. It occurs when an organization goes through all the required, bureaucratic…
Read More ›
Uncategorized
By MissionReady
July 10, 2026
The Hidden Peril: When “Assembled” Systems Fail. In the high-stakes environment of medical and wellness technology, the pursuit of cost-efficiency…
Read More ›
LinkedIn Newsletter
By Ann Marie Neufelder
April 28, 2026
Software FMEA and STPA approach safety from opposite directions—one bottom-up, one top-down. Here’s how to tell which technique actually fits the risk you’re trying to find…
Read More ›
LinkedIn Newsletter
By Ann Marie Neufelder
March 20, 2026
“For years, software-intensive systems have been forced into ‘hardware-centric’ FMEA models like…”
Read More ›
Uncategorized
By MissionReady
January 16, 2026
Since the first recorded software failure in 1962, the prevailing approach to deploying software-intensive systems has been to hope for…
Read More ›
Uncategorized
By MissionReady
January 16, 2026
In 1979 I wrote my first Fortran program. We were still using punch cards back then. You had to wait…
Read More ›
Uncategorized
By MissionReady
January 15, 2026
Are You Wasting Effort on Low-Return Software FMEA Activities? Not all software FMEA approaches deliver the same value. Some methods…
Read More ›
Uncategorized
By MissionReady
January 14, 2026
The Birmingham City Council undertook a project to replace its aging SAP financial and HR system with the Oracle Fusion…
Read More ›
LinkedIn Newsletter
By Ann Marie Neufelder
September 4, 2025
Critical software failures that are common, identifiable, and preventable. When developing software, engineers often…
Read More ›
LinkedIn Newsletter
By Ann Marie Neufelder
July 27, 2025
Continuing where last month’s newsletter left off—covering the severity assessment involved in merging Software FMEA and Software FTA…
Read More ›
LinkedIn Newsletter
By Ann Marie Neufelder
May 27, 2025
Reliable software analyses aim to ensure a software-intensive system is available, doesn’t cause premature wear out for…
Read More ›
LinkedIn Newsletter
By Ann Marie Neufelder
April 25, 2025
A latent defect only becomes a failure once the right scenario triggers it—here’s how to predict which scenarios will do that…
Read More ›